国产欧美日韩亚洲一区二区三区_91精品大片在线观看_亚洲av无码不卡顿片_亚洲av色男人的天堂

NEWS

Repair and maintenance of vertical laminating machine

Date:2016-11-12    Font size:Big  Medium  Small

Vertical laminating machine repair and maintenance of the laminating machine is the main part of the heating aluminum plate, the original station, hydraulic cylinder, distribution box, etc.

1 After the heating plate is broken, the temperature does not rise (or the temperature rises very slowly) (normal temperature rises for half an hour) that is the heating tube is broken, remove the screw of the square tube and replace the heating tube on it (heating tube 220 electricity)

2. The original station is to control the lifting of the cylinder, so it is very important to fill the vertical laminating machine with a little oil (Great Wall Zhuo Li hydraulic oil), and the working time can not exceed 10 hours after the overtime will damage the machine, change the hydraulic oil once a year.

3. The hydraulic cylinder should not be too hot as it will slowly leak oil, so the working time should not exceed 10 hours.

The distribution box is composed of rotary switch indicator light, temperature control, voltmeter, time relay and button. If any part is not working, replace it immediately.

5 high temperature paper with material baked, stick to the high temperature paper with water cloth can be wiped.

Bake material is more than the replacement of high temperature paper must be used before the replacement of vertical laminating machine yarn paper to wipe the black residue to towel paste.



HOME

PRODUCTS

INQUIRY

CONTACT US